COPT Data Center
9651 Hornbaker Road · Manassas, Prince William County, VA
Source: OpenStreetMap
COPT Data Center is an operating data center in Prince William County, VA, operated by Prime Data Centers. DataCentersExposed has documented a 127,955 sq ft footprint and 1 tracked EPA enforcement record at this site.
Reporting by Eric Keller · Updated Jul 15, 2026
Overview
source: linkdata center
Operator chain
- Ultimate parentPrime Data Centers
- Files asPrime Data Centers
- This facilityCOPT Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Prince William supervisors reject Dulles Cloud South data center proposalLoudoun Times-Mirror· Jul 9, 2026
- This machine in Delaware turns data center heat into waterTechnical.ly· Jul 2, 2026
- Digital Realty to pay Blackstone $3.5 billion for stake in Virginia data centersThe Economic Times· Jun 30, 2026
- Viral video of a man calling out a proposed Google data center in Iowa is of a data center owner himselfBusiness Insider· Jun 18, 2026
- Data Centers: Examples of Adverse Health and Other Effectstrialsitenews.com· May 18, 2026
- Legal battle over massive data center campus continues after last-minute appealWJLA· May 3, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHO- Clean Air Actno penaltyformal · reported 2024-07-09
Environmental permits
source: Permit register- Clean Air Act permitted sourceVA0000005110774152NAICS 518210; ECHO compliance status: No Violation Identified
- Clean Air Act permitted sourceVA0000005110774265NAICS 518210; ECHO compliance status: No Violation Identified
- VA DEQ air permit (minor NSR)74296Diesel backup-generator air permit. Program: mNSR. Reg. 74296.
- VA DEQ air permit (minor NSR)74265Diesel backup-generator air permit. Program: mNSR. Reg. 74265.
- VA DEQ air permit (minor NSR)74152Diesel backup-generator air permit. Program: mNSR. Reg. 74152.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~25 to 55 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Victory Elementary in Bristow, is 1.3 mi from this site (694 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.