Mapped (unverified)colocation
Connected Krakow
Krakow, województwo małopolskie, Poland
Source: Primary source
Connected Krakow is a mapped data center in województwo małopolskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo małopolskie
Overview
source: linkConnected sp. z o.o. — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Ukraina obnażyła skalę rosyjskiej propagandy? Eksperci studzą emocjeKomputer Świat· Oct 12, 2026
- Drony uderzyły w "rosyjskiego Google'a". Klienci skarżą się na paraliż usług w sieciPolskie Radio 24· Oct 11, 2026
- Ukraina uderza w rosyjskiego giganta. Trzecie centrum danych Yandexu zaatakowaneRzeczpospolita· Oct 11, 2026
- Atak Ukrainy na centrum danych Yandex. Przestały działać popularne serwisyRMF24· Oct 11, 2026
- Drony uderzyły w centrum danych w Rosji. Pożar i przerwa w działaniuTVN24· Oct 8, 2026
- Rosyjski Yandex zaatakowany. Piekielny ogień trawi centrum danych „rosyjskiego Google'a”Rzeczpospolita· Oct 8, 2026
See something wrong or missing on this page? Suggest a correction.