Under construction

Compass Datacenters Meridian

Meridian, Lauderdale County County, MS

Source: Primary source

Compass Datacenters Meridian is a under construction data center in Lauderdale County County, MS, operated by Compass Datacenters, LLC. DataCentersExposed has documented 500 MW of reported power capacity at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Compass Datacenters, LLC
Power
500 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

$10B project, 8 buildings; end-tenant undisclosed; Mississippi Power.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.4 mi
Unknown109966 · 115 kV
Transmission line
0.4 mi
115 kV line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, T J Harris Elementary in Meridian, is 1.0 mi from this site (434 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.