Collocation Washingtonstraße Dresden is a mapped data center in Sachsen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Sachsen
Overview
source: linkSachsenGigaBit GmbH — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Neuromorphe Chips: Warum SMD-Schablonen entscheidend sindall-electronics.de· Aug 21, 2026
- Infineon erhöht KI-Geschäftsplanung für Leistungshalbleiter deutlichit boltwise· Aug 5, 2026
- Infineon erreicht Umsatzrekord: KI-Rechenzentren treiben WachstumEuronews.com· Aug 5, 2026
- Rechenzentren und Stromkosten: Wer in Deutschland für KI-Hunger zahlt – und wie die USA es regeln wollenBerliner Zeitung· Jul 29, 2026
- Infineon: Halbleiterkonzern setzt mit neuem Werk in Dresden auf KI-RechenzentrenWiWo· Jul 2, 2026
- Zielgerade für Europas Chip-Hoffnung: Infineon nimmt Rekord-Werk in BetriebMerkur· Jun 14, 2026
See something wrong or missing on this page? Suggest a correction.