Cerebras Systems Data Center
Oklahoma City, Oklahoma County, OK
Source: Primary source
Cerebras Systems Data Center is an operating data center in Oklahoma County, OK. DataCentersExposed has documented 10 MW of reported power capacity and a 82,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Massive El Reno water leak traced to Bitcoin mining data center facilityKFOR.com· Aug 28, 2026
- Piedmont residents raise concerns over proposed data center at city council meetingKOCO· Aug 26, 2026
- Piedmont delays decision on data center; neighboring city opposes proposal tooYahoo· Aug 26, 2026
- Family living next to proposed Piedmont-area data center fears impact as zoning decision remains pendingNews 9· Aug 25, 2026
- A data center campus would mean millions for an Oklahoma town. One family faces the human costKOCO· Aug 23, 2026
- Kansas towns sue petition organizers against data center projectsOklahoma Energy Today· Aug 21, 2026
Data-center discussions in Oklahoma County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Dove Science Academy Es in Warr Acres, is 1.4 mi from this site (486 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.