Mapped (unverified)
Centro de Informática (CPD)
Distrito Federal, Brazil
Source: OpenStreetMap
Centro de Informática (CPD) is a mapped data center in Distrito Federal, Brazil. DataCentersExposed has documented a 12,870 sq ft footprint at this site. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
12,870 sq ft
Grid carbon
110 gCO₂/kWh
Clean electricity
89%
Region
Distrito Federal
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- Conheça o data center bilionário de IA que vai atender gigante da tecnologia no interior de SPG1· May 28, 2026
- Maior Data Center de Inteligência Artificial da América Latina será construído na região Oeste de Uberlândiauberlandia.mg.gov.br· Sep 24, 2025
- Como o uso de inteligências artificiais consome água?UFSM – Universidade Federal de Santa Maria· Sep 4, 2025
- Uberlândia receberá Data Center de IA com aporte bilionário de empresa americana e geração de 2 mil empregosG1· Jul 9, 2025
- Moza Banco Investe em Centro de Dados de Classe Mundial e Reforça Infra-Estrutura TecnológicaO.Económico· May 9, 2025
- Quais os 5 maiores data centers do mundo?Olhar Digital· May 24, 2024