Mapped (unverified)colocation
CentriLogic Arlington (ARL)
Bracknell, Bracknell Forest, United Kingdom
Source: Primary source
CentriLogic Arlington (ARL) is a mapped data center in Bracknell Forest, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Bracknell Forest
Overview
source: linkCentriLogic — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Bracknell home with green outlook hits market for £325,000Bracknell News· Oct 12, 2026
- Data centre set to replace Microsoft headquartersButtondown· Oct 7, 2026
- Thames Valley data centre could hold up plans for a new Berkshire hospital, MP warnsBracknell News· Oct 7, 2026
- Bracknell tech firm honoured with prestigious King’s AwardBracknell News· Oct 6, 2026
- Plans to demolish Microsoft HQ to build £200m data centre in ReadingBracknell News· Oct 5, 2026
- AWS granted planning permission for data center in Iver, UKData Center Dynamics· Oct 1, 2026
See something wrong or missing on this page? Suggest a correction.