Mapped (unverified)colocation
CentriLogic Arlington (ARL)
Bracknell, Bracknell Forest, United Kingdom
Source: Primary source
CentriLogic Arlington (ARL) is a mapped data center in Bracknell Forest, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Bracknell Forest
Overview
source: linkCentriLogic — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Raspberry Pi shares surge after profit guidance hikedBracknell News· Jun 5, 2026
- WATCH: Residents told to evacuate their homes as HUGE fire reported in BracknellBucks Free Press· May 25, 2026
- AWS wins UK's HMRC data center services contract after Fujitsu exitData Center Dynamics· Mar 26, 2026
- SCC Bracknell: Delivering Trusted IT Excellence in the Heart of Berkshireelevatenew.co.uk· Mar 7, 2026
- Amazon files to develop tape library data center outside London, UKData Center Dynamics· Feb 16, 2026
- 900-space park and ride site in Cardiff could be transformed into data centreInsider Media Ltd· Feb 5, 2026
See something wrong or missing on this page? Suggest a correction.