Mapped (unverified)
Cdl
Mato Grosso, Brazil
Source: OpenStreetMap
Cdl is a mapped data center in Mato Grosso, Brazil. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
110 gCO₂/kWh
Clean electricity
89%
Region
Mato Grosso
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- Caucaia deve receber novo mega data center de R$ 150 bilhões, anuncia prefeitoOpiniãoCE· May 15, 2026
- Upskilling Malaysia’s Engineers To Keep Pace With The Evolving LandscapeBusinessToday Malaysia· Jun 16, 2026
- 'Shockwaves across the state': Hill County residents continue opposition to proposed data center developmentKXXV· May 29, 2026
- Utilities ETF FXU Hits 17% Annual Gain As Data Centers Reshape Power Demand24/7 Wall St.· May 19, 2026
- CDL Delivers Capital Gains Alongside Income as Rates Hover Near 4.4%24/7 Wall St.· May 15, 2026
- I'm a truck driver. I'm not worried about AI taking my job.USA Today· Apr 19, 2026