Mapped (unverified)colocation
Capital Online Zhao Wei Datacenter
Beijing, China
Source: Primary source
Capital Online Zhao Wei Datacenter is a mapped data center in China. It runs on China's grid, which was 58% fossil-fuelled at 526 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
526 gCO₂/kWh
Clean electricity
42%
Region
China
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCDS Global Cloud Co., LTD — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
526 gCO₂/kWh
Clean electricity
42%
Fossil electricity
58%
National grid context, not this facility's own metering. Full country picture: China data centers.
In the news
source: Google News (local + English)- 倒计时8天|DCIC2026 第15届数据中心产业发展大会,5月27日北京启幕新浪财经· May 19, 2026
- 随着AI大模型需求激增,河北算力中心如何成为全球创新的重要支撑?新浪新闻_手机新浪网· May 11, 2026
- 2026“星算·智联”太空算力研讨会在京成功召开- 行业动态- 新闻动态开放数据中心委员会· Jan 28, 2026
- 根据北京市太空数据中心创新联合体官方消息,"辰光一号"已完成产品研制并进入总装试验阶段,计划于2025年底或2026年初择机发射。 这一时间框架被北京市科委、中关村管委会正式确认,是目前最权威的官方表述。"辰光一号"是北京市支持研发的首个算力星座计划新浪网· Jan 13, 2026
- 我们的2025丨数字底座能级跃升,有力支撑数智化转型- 新闻动态group.citic· Jan 4, 2026
- $顺灏股份(SZ002565)$ 北京轨道辰光的太空卫星发射成功后,极有可能会反向要约收购002565(结合上交所新规:...雪球· Dec 27, 2025