Mapped (unverified)
Building 2
Grand Est, France
Source: OpenStreetMap
Building 2 is a mapped data center in Grand Est, France. DataCentersExposed has documented a 20,283 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
20,283 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Grand Est
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- L’Ukraine frappe un (puis 2, puis 3) data center stratégique de YandexDCmag· Oct 12, 2026
- Un data center pour l’intelligence artificielle sur la friche des Fonderies du Poitou à Ingrandes, cinquante emplois annoncéslanouvellerepublique.fr· Sep 20, 2026
- Toulouse : Spie Building Solutions modernise le data center de la Direction nationale des statistiques du commerce extérieur (DNSCE) sans arrêt des serveursCahiers Techniques du Bâtiment· Sep 4, 2026
- Telehouse inaugure un nouveau data center sur son campus de Francfort et poursuit son développement en EuropeDCmag· Sep 1, 2026
- Data center : avis favorable pour la construction d’une unité à 2 Mds€ près de Mulhouse, pilotée par MicrosoftLe Moniteur· Aug 25, 2026
- Malgré l'opposition, un rapport favorable émis pour la construction du data center de Microsoft : "seuls les pouvoirs économiques vont être entendus"France 3 Régions· Aug 25, 2026
See something wrong or missing on this page? Suggest a correction.