Mapped (unverified)colocation
Bolzano - Infranet AG Datacenter
Bolzano, Trentino-Alto Adige/Südtirol, Italy
Source: Primary source
Bolzano - Infranet AG Datacenter is a mapped data center in Trentino-Alto Adige/Südtirol, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Trentino-Alto Adige/Südtirol
Overview
source: linkInfranet AG — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Data Center Alto Adige: massima sicurezza per i dati pubblicidererker.it· Jul 22, 2026
- Viaggio nei data center italiani: quali sono, dove sono e di chi sonoIl Bo Live· May 4, 2026
- La famiglia Podini vuole raddoppiare gli hotel in Alto Adige. Ecco che cosa cercaMilano Finanza· Feb 27, 2026
- Forum Digital: "I nostri dati meritano la massima protezione" | Tutte le news | News | Amministrazione provincia BolzanoNews | Südtiroler Landesverwaltung· Oct 29, 2025
- Il ritardo dei data center mette a rischio la competitivitàIl Sole 24 ORE· Oct 27, 2025
- Via libera al nuovo data center. Alla città 10 milioni in opereIl Giorno· Oct 8, 2025
See something wrong or missing on this page? Suggest a correction.