Mapped (unverified)colocation
Berget Boras
Boras, Västra Götalands län, Sweden
Source: Primary source
Berget Boras is a mapped data center in Västra Götalands län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Västra Götalands län
Overview
source: linkBoras Energi/Nat AB — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- AI-bjässe skrämde StockholmsbörsenBorås Tidning· Aug 24, 2026
- Ericssonchefen om Europa: ”Shitty neighborhood”Borås Tidning· Jul 14, 2026
- Positiva resultat väntas i rapportflodenBorås Tidning· Jul 13, 2026
- AI-teknik ska tränas att upptäcka snattareOmni – Alla nyheter. Alla perspektiv.· Jun 25, 2026
- Därför rusar priset på glass - ”chockerande”Borås Tidning· Jun 25, 2026
- Företag planerar storsatsning – kan ge 50 nya jobbBorås Tidning· Jun 13, 2026
See something wrong or missing on this page? Suggest a correction.