Mapped (unverified)colocation
Belvedere DC
Aversa, Campania, Italy
Source: Primary source
Belvedere DC is a mapped data center in Campania, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Campania
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNHM - S.R.L. — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Il progetto del più grande data center del SudWired· May 10, 2024
- Your AI chatbot is polluting my backyardthebulletin.org· May 21, 2026
- Towamencin talks draft of data center codesthereporteronline· Mar 30, 2026
- Data centers become a flashpoint in Wisconsin politicsWisconsin Watch· Jan 22, 2026
- Data center ‘extension cord’ draws landowners’ ireE&E News by POLITICO· Jan 20, 2026
- Residents form alliance against Port Washington data center power lines proposalSpectrum News· Nov 20, 2025
See something wrong or missing on this page? Suggest a correction.