Beacon Point Data Center is a proposed data center in Nueces County, TX, operated by Hut 8. DataCentersExposed has documented 352 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkPurpose: Crytomine/AI. Announced investment: $9.8B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas - TIKR.comTIKR.com· Aug 23, 2026
- Hut 8 (HUT) Stock Looks Fully Valued Despite Texas Data Center Audit - Yahoo FinanceYahoo Finance· Aug 18, 2026
- United States: Texas Governor Abbott Announces Microsoft, Hut 8 And Equinix Commit To Comply With His Data Center Standards - The St Kitts Nevis ObserverThe St Kitts Nevis Observer· Aug 14, 2026
- Hut 8 Affirms Responsible Data Center Development Commitment in Texas Communities - The Fast ModeThe Fast Mode· Aug 13, 2026
- Hut 8 (HUT) Faces ERCOT Delays For Its 1GW Texas AI Data Center - Yahoo FinanceYahoo Finance· Aug 5, 2026
- NVIDIA Reportedly Behind Hut 8 Texas Data Center Lease Worth Up To $50.2 Billion - Pulse 2.0Pulse 2.0· Jul 28, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Nueces CO J J A E P in Robstown, is 0.5 mi from this site. 7 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).