Skip to content
DataCentersExposed
Proposed

Beacon Point Data Center

Robstown, Nueces County, TX

Source: Primary source

Beacon Point Data Center is a proposed data center in Nueces County, TX, operated by Hut 8. DataCentersExposed has documented 352 MW of reported power capacity at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Hut 8
Operator
Hut 8
Power
352 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Purpose: Crytomine/AI. Announced investment: $9.8B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

  • Ultimate parent
    Hut 8
  • Files as
    Hut 8
  • This facility
    Beacon Point Data Center

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.7 mi
Unknown307586 · 138 kV
Transmission line
2.4 mi
345 kV line
Municipal water
Served
Nueces County Wcid 3

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Nueces CO J J A E P in Robstown, is 0.5 mi from this site. 7 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.