Mapped (unverified)colocation
AtlasEdge DC Hamburg HAM001
Hamburg, Hamburg, Germany
Source: Primary source
AtlasEdge DC Hamburg HAM001 is a mapped data center in Hamburg, Germany, operated by AtlasEdge. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
AtlasEdge
Operator
AtlasEdge
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hamburg
Overview
source: linkAtlasEdge — colocation facility (5 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Atlas Edge nimmt „STR001“ bei Stuttgart in BetriebDataCenter-Insider· Jul 22, 2025
- Atlas Edge baut carrier-neutrales Datacenter in StuttgartDataCenter-Insider· Apr 29, 2025
- Datacenter One betreibt ein Rechenzentrum in der Region HamburgDataCenter-Insider· Feb 6, 2024
- Datacenter One eröffnet neues Rechenzentrum in der Region HamburgNetzpalaver· Feb 6, 2024
- Datacenter sind ein begehrtes InvestitionsobjektDataCenter-Insider· Dec 20, 2023
- Grundsteinlegung für Co-Location-Rechenzentrum in HamburgDataCenter-Insider· Jan 26, 2023
See something wrong or missing on this page? Suggest a correction.