Mapped (unverified)colocation
Associated Engineering Plaza (10909 Jasper Avenue)
Edmonton, Alberta, Canada
Source: Primary source
Associated Engineering Plaza (10909 Jasper Avenue) is a mapped data center in Alberta, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Alberta
Overview
source: linkColliers International — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Meta data centre could drive up Albertans’ power bills: reportCTV News· Aug 28, 2026
- How Alberta Became Ground Zero for Data Centre Development in Canadatodayville.com· Aug 24, 2026
- Alberta minister faces more fury at second town hall on AI data centresCTV News· Aug 21, 2026
- Industry puzzled by apparent lack of public support for AI data centres in AlbertaCTV News· Aug 21, 2026
- Alberta technology minister met with jeers at first town hall on AI data centresCBC· Aug 20, 2026
- First Nation defeats legal challenge from Kevin O'Leary-backed data centreEdmonton Journal· Aug 14, 2026
See something wrong or missing on this page? Suggest a correction.