Mapped (unverified)colocation
Artnet DC Gdynia GAC133
Gdynia, województwo pomorskie, Poland
Source: Primary source
Artnet DC Gdynia GAC133 is a mapped data center in województwo pomorskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo pomorskie
Overview
source: linkArtnet Spolka z ograniczona odpowiedzialnoscia — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.