ark data centers - Pittsburgh, PA
Freeport, PA
Source: Primary source
ark data centers - Pittsburgh, PA is a mapped data center in PA. DataCentersExposed has documented 1.5 MW of reported power capacity and a 11,200 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkark data centers — colocation facility (3 networks present). Source: PeeringDB.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- What is lifting Freeport-McMoRan (NYSE:FCX) as copper benchmarks hover near record ground?Kalkine Media· Oct 9, 2026
- Freeport-McMoRan Inc. Stock Grades | FCXBarron's· Oct 8, 2026
- Freeport-McMoRan (NYSE:FCX) Rides Firm Copper and Data-Center DemandKalkine Media· Oct 7, 2026
- Data Centers Need Copper, Concrete, and Cooling. Here Are 3 Boring Industrials Set to Cash In.The Globe and Mail· Oct 1, 2026
- Freeport-McMoRan (NYSE:FCX) in Focus as Copper Nears Record Highs on AI Data Center DemandKalkine Media· Sep 30, 2026
- Engineer explains how months-long data center delivery could impact traffic in multiple countiesWPXI· Sep 7, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, South Buffalo El Sch in Freeport, is 3.8 mi from this site (223 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.