Under construction

Aliquippa Data Center Campus

Aliquippa, Beaver County, PA

Source: Primary source

Aliquippa Data Center Campus is a under construction data center in Beaver County, PA, operated by Five 9s Digital. DataCentersExposed has documented 496 MW of reported power capacity and a 250,000 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Five 9s Digital
Power
496 MW
Footprint
250,000 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Could be sized up to 500,000 sq feet. Site of former steel mill. Investement by Blackstone and PPL Corp Announced investment: $25.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.5 mi
Unknown162370
Transmission line
1.0 mi
138 kV line
Municipal water
Served
Mun Water Auth Of Aliquippa

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

No recent coverage found for this facility.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, State Street El Sch in Baden, is 0.6 mi from this site (275 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.