Agincourt
Valparaiso, Porter County, IN
Source: Primary source
Agincourt is a blocked data center in Porter County, IN. DataCentersExposed has documented a 2,400,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Porter, Indiana
Agincourt in Valparaiso, IN is contested. Opposition reported. Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Ivy Tech Community College and Microsoft Sign Memorandum of Understanding to Strengthen Indiana's Workforce PipelineGreatNews.Life· Jun 19, 2026
- Valparaiso leaders take first steps to restrict data centers within city limitsnwitimes.com· May 12, 2026
- Hobart data center open house answers some questions but not allChicago Tribune· May 1, 2026
- Limes Accelerates in Chile: Environmental Approval for BESS Ganso, 150 MW BESS ProjectAZoCleantech· Apr 22, 2026
- Indiana called ‘the innovation capital of the world’Chicago Tribune· Apr 15, 2026
- That 1% incentive to encourage data center approvals? Final deal watered it downIndiana Capital Chronicle· Mar 26, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Flint Lake Elementary School in Valparaiso, is 1.3 mi from this site (474 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.