365 Data Centers Ft. Lauderdale (FLL)
Ft. Lauderdale, FL
Source: Primary source
365 Data Centers Ft. Lauderdale (FLL) is a mapped data center in FL.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: link365 Data Centers — colocation facility (6 networks present). Source: PeeringDB.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Fort Lauderdale company takes full ownership of Arkansas AI data center in $25M deal - bizjournals.combizjournals.com· Aug 3, 2026
- Donalds pushes back on Jolly AI data center claim, outlines agenda after Fort Lauderdale rally - Florida’s VoiceFlorida’s Voice· Jul 27, 2026
- Fort Lauderdale company bets on AI with Arkansas data center deal - The Business JournalsThe Business Journals· Jun 26, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Boyd H. Anderson High School in Lauderdale Lakes, is 0.6 mi from this site (2,038 students). 6 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.