365 Data Centers Detroit (DT1)
Southfield, MI
Source: Primary source
365 Data Centers Detroit (DT1) is a mapped data center in MI.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: link365 Data Centers — colocation facility (9 networks present). Source: PeeringDB.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Data centers, hazardous waste weigh on voters in Michigan’s 31st House District - Planet DetroitPlanet Detroit· Oct 8, 2026
- Republican congressional candidate Tom Smith says the Great Lakes make Michigan ideal for data centers - Detroit Metro TimesDetroit Metro Times· Oct 8, 2026
- Benson, James can't avoid the hard choices on data centers. Michigan needs an AI strategy. - The Detroit NewsThe Detroit News· Oct 8, 2026
- Michigan gubernatorial candidates clash over data centers ahead of midterm election - CBS NewsCBS News· Oct 7, 2026
- How Big Data Centers Overwhelm Opposition in Small Towns - GoverningGoverning· Oct 7, 2026
- Data centers investments, personal finances take center stage at Michigan governor debate - Heartland SignalHeartland Signal· Oct 7, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Michigan reported $1.1M in Data Center / Colocation Sales and Use Tax Exemption (MCL 205.54ee / 205.94, pre-2025 program) for FY2023 (Michigan Department of Treasury, Office of Revenue and Tax Analysis (ORTA)). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Laurus Academy in Southfield, is 177 ft from this site (749 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.