Mapped (unverified)
Data center data center, Tokyo, Japan
Tokyo, Japan
Source: OpenStreetMap
西東京データセンター 1号棟 in Tokyo, Japan is a mapped facility. DataCentersExposed has documented a 48,594 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-20 MW
Footprint
48,594 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Tokyo
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- データセンターで太陽光発電の再エネ活用 キヤノンITSが実証実験ITmedia· Jan 15, 2026
- キヤノンITソリューションズ、西東京データセンターで太陽光発電の実証実験ZDNET Japan· Dec 19, 2025
- キヤノンITソリューションズ、西東京データセンター2号棟に太陽光発電設備を導入 発電量の検証を開始AMP[アンプ]· Dec 18, 2025
- キヤノンITS、西東京データセンター2号棟に太陽光発電設備を導入し発電量の検証を開始日本経済新聞· Dec 18, 2025
- キヤノンITSが長期ビジョン「VISION2025」の進捗を説明、KGIは達成の見通しクラウド Watch· Nov 28, 2025
- 北海道・東京・大阪の3都市にデータセンターを設置スマートグリッドフォーラム· Nov 16, 2025