Skip to content
DataCentersExposed
operator

TransGas Development, LLC

DataCentersExposed tracks 2 data centers operated by TransGas Development, LLC across 1 state, of which 2 are proposed or under construction, with 4.8 GW of reported power capacity.

Operator added from the FracTracker Alliance U.S. Data Centers Tracker.

Reporting by

Facilities
2
tracked
States
1
footprint
Pipeline
2
proposed / building
Reported power
4.8 GW
2 facilities

Where TransGas Development, LLC builds

FacilityLocationStatusMW
Adams Fork Harless Data CenterHolden, WVProposed2,398.5
Adams Fork Wharncliffe Data CenterWharncliffe, WVProposed2,398.5

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.