operator
Homer City Redevelopment
DataCentersExposed tracks 1 data center operated by Homer City Redevelopment across 1 state, of which 1 is proposed or under construction, with 4.5 GW of reported power capacity.
Data-center operator/developer. Added from the 2026-06-18 pipeline sweep.
Reporting by Eric Keller
Facilities
1
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
4.5 GW
1 facilities
Where Homer City Redevelopment builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Homer City Energy Campus | Homer City, PA | Under construction | 4,500 |