operator
Genesis Digital Assets
DataCentersExposed tracks 1 data center operated by Genesis Digital Assets across 1 state, with 195 MW of reported power capacity.
Data-center operator/developer. Added from the 2026-06-18 pipeline sweep.
Reporting by Eric Keller
Facilities
1
tracked
States
1
footprint
Pipeline
0
proposed / building
Reported power
195 MW
1 facilities
Where Genesis Digital Assets builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Genesis Digital Assets Pyote | Pyote, TX | 195 |