Skip to content
DataCentersExposed
operator

Genesis Digital Assets

DataCentersExposed tracks 1 data center operated by Genesis Digital Assets across 1 state, with 195 MW of reported power capacity.

Data-center operator/developer. Added from the 2026-06-18 pipeline sweep.

Reporting by

Facilities
1
tracked
States
1
footprint
Pipeline
0
proposed / building
Reported power
195 MW
1 facilities

Where Genesis Digital Assets builds

FacilityLocationStatusMW
Genesis Digital Assets PyotePyote, TXOperating195

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.