operator
DC BLOX
DataCentersExposed tracks 1 data center operated by DC BLOX across 1 state, of which 1 is proposed or under construction, with 50 MW of reported power capacity.
Reporting by Eric Keller
Facilities
1
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
50 MW
1 facilities
Where DC BLOX builds
| Facility | Location | Status | MW |
|---|---|---|---|
| DC BLOX Nashville (Grassmere Park) | Nashville, TN | Proposed | 50 |