Skip to content
DataCentersExposed
operator

Bitdeer

DataCentersExposed tracks 1 data center operated by Bitdeer across 1 state, with 563 MW of reported power capacity.

Data-center operator/developer. Added from the 2026-06-18 pipeline sweep.

Reporting by

Facilities
1
tracked
States
1
footprint
Pipeline
0
proposed / building
Reported power
563 MW
1 facilities

Where Bitdeer builds

FacilityLocationStatusMW
Bitdeer RockdaleRockdale, TXOperating563
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$125K
2025–2026
Filings
3
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
TOWER STRATEGY, LLC
Manufacturing
$75Kfiling
2025
TOWER STRATEGY, LLC
Manufacturing
$50Kfiling
2025
BITDEER TECHNOLOGIES GROUP
Computers / internetManufacturingScience / techTrade
filing

Amounts are each filing's total reported lobbying by Bitdeer (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.