Skip to content
DataCentersExposed
County data-center profile

Lynchburg County, Virginia

DataCentersExposed tracks 1 AI data center in Lynchburg County, Virginia — 0 operating and 0 in the pipeline. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
1
Operating
0
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
4Low
  • Project exposure · 7
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Lynchburg County

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 2 standardized 36 MW campuses in Lynchburg County by 2035 — roughly 72 MW of new electricity demand and ~70 M gal/yr of cooling water. For scale, we currently track 1 real data center in Lynchburg County.

Modeled new campuses by demand-growth scenario
  • Higher growth2
    72 MW · ~70 M gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Lynchburg County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

1 facilities

Every tracked facility

FacilityOperatorStatusMW
Lumos NetworksMapped (unverified)
Accountability

County commissioners

How the Lynchburg County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.