Skip to content
DataCentersExposed
County data-center profile

Montgomery County, Pennsylvania

DataCentersExposed tracks 7 AI data centers in Montgomery County, Pennsylvania — 2 operating and 0 in the pipeline, led by Flexential Corp.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Montgomery County, Pennsylvania has 7 tracked data centers, 2 of them operating. Its composite data-center risk score is 8 out of 100 — see the breakdown above for which factors drive it.

Facilities
7
Operating
2
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
8Low
  • Project exposure · 14
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Montgomery County

Flexential Corp. has the largest presence in Montgomery County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

7 facilities

Every tracked facility

FacilityOperatorStatusMW
Csl Behring Data Ctr/King Of Prussia
KING OF PRUSSIA
Mapped (unverified)
DāStor: 3400 Horizon Drive
King of Prussia
Mapped (unverified)
Flexential Philadelphia - Collegeville
Collegeville
Flexential Corp.Operating
Innovation 2201 LLC / Upper Merion Twp
KING OF PRUSSIA
Mapped (unverified)
Lumen NorristownLumen Technologies, Inc.Mapped (unverified)
TierPoint Valley ForgeTierPoint, LLCOperating
Valley Forge Digital Utility Facility / Lower Providence
NORRISTOWN
Mapped (unverified)
Accountability

County commissioners

How the Montgomery County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.