Skip to content
DataCentersExposed
County data-center profile

Cobb County, Georgia

DataCentersExposed tracks 5 AI data centers in Cobb County, Georgia — 2 operating and 2 in the pipeline, drawing 534 MW of reported power demand, led by QTS Realty Trust, LLC. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
5
Operating
2
Pipeline
2

Reporting by · Updated May 29, 2026

Risk breakdown
16Low
  • Project exposure · 10
  • Power demand · 23
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Cobb County

Facilities here with disclosed capacity draw 534 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

QTS Realty Trust, LLC has the largest presence in Cobb County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 2 standardized 36 MW campuses in Cobb County by 2035 — roughly 72 MW of new electricity demand and ~70 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 3 campuses (108 MW). For scale, we currently track 5 real data centers in Cobb County (534 MW of reported power).

Modeled new campuses by demand-growth scenario
  • High growth2
    72 MW · ~70 M gal/yr cooling water
  • Higher growth3
    108 MW · ~104 M gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Cobb County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

5 facilities

Every tracked facility

FacilityOperatorStatusMW
Marietta Data Center
Marietta
MMM Acquisitions LLC/GrindcapProposed180
Grindcap
Marietta
Proposed108
QTS Atlanta Metro
Atlanta
QTS Realty Trust, LLCMapped (unverified)240
Smyrna GA2
Smyrna
365 Data CentersOperating4
CoreSite AT2 - Marietta Data CenterAmerican Tower CorporationOperating2
Accountability

County commissioners

How the Cobb County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.