DataCentersExposed tracks 4 AI data centers in Miami-Dade County, Florida — 0 operating and 1 in the pipeline, drawing 16 MW of reported power demand. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
4
Operating
0
Pipeline
1

Reporting by · Updated May 29, 2026

Risk breakdown
7Low
  • Project exposure · 12
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Miami-Dade County

Facilities here with disclosed capacity draw 16 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 1 standardized 36 MW campus in Miami-Dade County by 2035 — roughly 36 MW of new electricity demand and ~0 M gal/yr of cooling water. For scale, we currently track 4 real data centers in Miami-Dade County (16 MW of reported power).

Modeled new campuses by demand-growth scenario
  • Higher growth1
    36 MW · ~0 M gal/yr cooling water

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

4 facilities

Every tracked facility

FacilityOperatorStatusMW
Iron Mountain Data Center
Miami
Under construction16
NAP of the Americas
Miami
Mapped (unverified)
NocRoom Miami IT ServicesMapped (unverified)
NocRoom Miami IT ServicesMapped (unverified)
Accountability

County commissioners

How the Miami-Dade County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.