Broward County, Florida
DataCentersExposed tracks 2 AI data centers in Broward County, Florida — 1 operating and 0 in the pipeline, led by Flexential Corp.. Its transparent data-center risk score is 0/100.
Sources: Methodology, Coverage scorecard
Broward County, Florida has 2 tracked data centers, 1 of them operating. Its composite data-center risk score is 6 out of 100 — see the breakdown above for which factors drive it.
Reporting by Eric Keller · Updated May 29, 2026
- Project exposure · 10
- Power demand · 0
- Water draw · n/a
- Land footprint · n/a
What's happening in Broward County
Flexential Corp. has the largest presence in Broward County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.
Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.
Every tracked facility
| Facility | Operator | Status | MW |
|---|---|---|---|
| Flexential Fort Lauderdale Fort Lauderdale | Flexential Corp. | — | |
| T-Mobile Everglades MSO Data Center Sunrise | — | Mapped (unverified) | — |
County commissioners
How the Broward County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.