Iron Mountain VA-3
Prince William County, VA
Source: OpenStreetMap
Iron Mountain VA-3 is a mapped data center in Prince William County, VA, operated by Iron Mountain Incorporated. DataCentersExposed has documented a 181,174 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkIron Mountain VA-3 is a mapped colocation data center in Prince William County, Virginia, run by Iron Mountain Incorporated. Its reported footprint is 181,174 square feet. The site draws power from Northern Virginia Electric Cooperative inside the PJM grid.
Operator chain
- Ultimate parentIron Mountain Incorporated
- Files asIron Mountain Incorporated
- This facilityIron Mountain VA-3
In the news
source: Google News- Iron Mountain Inc stock (US46284V1017): dividend hike and AI storage story attract attentionAD HOC NEWS· Jun 9, 2026
- Is Iron Mountain Incorporated (IRM) A Good Stock To Buy Now?Insider Monkey· Jun 9, 2026
- Iron Mountain Inc stock (US46284V1017): data-center REIT rides AI and cloud tailwinds after fresh reAD HOC NEWS· Jun 8, 2026
- Iron Mountain Prioritizes Sustainable Benchmarking & Certification for Data Center AssetsNareit· Jun 4, 2026
- Iron Mountain Inc stock (US46284V1017): shares trade near highs as NYSE volume stays elevatedAD HOC NEWS· Jun 1, 2026
- Iron Mountain stock (US46284V1017): data?center expansion and steady REIT growth draw investor attenAD HOC NEWS· May 21, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Iron Mountain Incorporated (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2024 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2023 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~35 to 75 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, George P. Mullen Elementary in Manassas, is 1.0 mi from this site (751 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.