Skip to content
DataCentersExposed
Operating

Global Switch London East

London, United Kingdom

Corroborated by OpenStreetMap · Wikidata

Global Switch London East is an operating data center in United Kingdom, operated by Global Switch. DataCentersExposed has documented a 67,367 sq ft footprint and 1 environmental-permit record at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Global Switch
Operator
Global Switch
Est. capacity
~10-30 MW
Footprint
67,367 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Attribution & capacity confidence:highprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Global Switch London East is an operating data center in London, United Kingdom, run by Global Switch. Public records put its footprint at 67,367 square feet. Available records do not disclose an ultimate parent above Global Switch for the site.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%

National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.

Environmental permits

source: Permit register
  • GLOBAL SWITCH LIMITEDEPR/BP3530YR
    EPR permit · holder "GLOBAL SWITCH LIMITED" · Tower Hamlets · Combustion; Any Fuel =>50MW - 1.1 A(1) a) · within ~2 km of the mapped site

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.